FORT MCHENRY CHANNEL - CURTIS BAY
General / Marine Construction (Excluding Bridges) / Dredging
Location: 39-13.48N 076-32.29W 39-13.11N 076-31.92W 39-13.21N 076-32.55W 39-13.15N 076-34.62W 39-13.44N 076-34.62W 39-13.45N 076-34.21W 39-13.37N 076-34.05W 39-13.41N 076-32.37W 39-13.48N 076-32.29W Curtin Maritime (CMC) will be conducting dredging activities at Curtis Bay commencing on or about December 1, 2026, and conclude on or about March 1, 2027. During this time, CMC will be operating 24 hours per day / 7 days per week (Monday through Sunday). Maintenance dredging within the existing channels and turning basins will occur, and material will be loaded into scows and disposed by an off-loader barge at two sites (Cox Creek Placement Site and Poplar Island). The operation will consist of a 255-ft mechanical dredge (DB Avalon), two 200-255-ft barges, four Split Hull Scows, five Tugs (Alice C, Kimberly C, John Joseph, Patricia Jean and David Winslow). All manned equipment will be monitoring VHF-FM Channels 13 and 16. Project Manager, Mr. Robert Collaro can be reached at (772) 643-0784. Mariners are urged to proceed with caution after passing arrangements have been made. MSI #58530.
Valid 2026-12-01 to 2027-03-05.
USCG East District Local Notice to Mariners 47/2026