MANASQUAN INLET - MANASQUAN RIVER
General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes
Location: 40-05.32N 074-04.04W Mariners please be advised that Wyndham Construction will be conducting construction at the mouth of the Point Pleasant Canal at approximate position 40°5.318’ N, 074°4.038’ W. Work will begin on October 1, 2026 and continue until December 31, 2026. There will be a crane barge spudded down adjacent to the bulkhead during operations. All mariners are requested to transit the work area at the slowest safe speed to maintain navigation and minimize wake. MSI #53706.
Valid 2026-09-15 to 2027-01-05.