DELAWARE BAY MAIN CHANNEL - LISTON RANGE
General / Marine Construction (Excluding Bridges) / Survey Operations
Location: 39-24.84N 075-29.34W S. T. Hudson Engineering will be conducting Hydrographic Survey Operations, they will deploy seabed frames from a 25-ft Safeboat, the M/V Ginny B, outside of the designated shipping channels. The seabed frame will be deployed on September 15 and marked with a surface buoy. The frames will remain submerged and no other survey operations will be conducted until recovery on October 20th. M/V Ginny B will monitor Channels 13 and 16 continuously throughout the survey. Mariners are advised to exercise caution when navigating near the survey vessel, maintain a safe distance, and proceed at reduced speed. Shoreside point of contact will be Joe Wozniak (609) 412-1242 and M/V Ginny B operator, Cole VanDorick (281) 726-3921. MSI #53593
Valid 2026-09-14 to 2026-10-22.
USCG East District Local Notice to Mariners 41/2026