HomeMapSky mapAlpha
More
Account
Loading…
Language: English

LNM05-C69FB2

SÉCURITÉ
Received: 23 Sept 2026, 00:00Updated: 11 Nov 2026, 18:57
Subscribe
Show on map
Search

Keywords

  • Operationsdredging operations, marine construction
Message content
PATAPSCO RIVER - SPARROWS POINT CHANNEL General / Marine Construction (Excluding Bridges) / Dredging Location: 39-12.73N 076-28.74W 39-11.67N 076-28.67W 39-11.64N 076-29.12W 39-12.68N 076-29.27W 39-12.73N 076-28.74W On or about October 1st, 2026, Cashman Dredging and Marine Contracting Co., LLC will begin dredging operations of the Sparrow Point Channel in Baltimore Harbor. Marine operations will be conducted 24 hours a day, 7 days a week. The project will utilize the Dredge Dale Pyatt, dump scows Kurt Schulte, M.E.R.C Shevlin, and Joe Verrochi, GL603, GL69, along with the hopper barges D.A. Chambers, C.J. Welch, and S. Tobin. Loaded scows will be transported by tug to the designated disposal locations at either the Norfolk Ocean Disposal Site (NODS), Masonville MPA Site or High Head DMCF. The unloaders Cape May and Kraken will operate at the Masonville MPA and High Head DMCF disposal sites. The marine equipment will be supported by the survey vessel Cape Elizabeth. All vessels will monitor VHF channels 14, 13, and 67. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made. MSI #54087. Valid 2026-09-28 to 2027-05-05. USCG East District Local Notice to Mariners 45/2026
Beta look