HomeMapWorld mapAlphaLearnNew
More
Account
Loading…
Language: English

US Coast Guard LNM - East District (D5) LNM05-BEC697

SÉCURITÉArchived
Received: Archived: Source checked:
Subscribe
Show on map
Search

Keywords

  • Operationsmarine construction
Message content
GREAT BRIDGE TO ALBEMARLE SOUND General / Marine Construction (Excluding Bridges) / Boring and Core Samples A barge will be temporarily moored on the East side of the swing bridge at Mt Pleasant Rd/N Landing Rd in the North Landing River between the hours of 0700-1700 from September 19, 2026 through September 25, 2026 while drilling and sampling. Water boring will be performed utilizing a track mounted drill rig secured to a floating barge. Barge will be secured in place utilizing spuds. Project area consists of one location in between the bridge fenders and one location South of the bridge fenders. Crofton Tug and Terracon barge will be monitoring VHF channels 13 and 16. Mariners are to use caution when transiting this area. MSI # 52975. Valid 2026-09-03 to 2026-09-26. USCG East District Local Notice to Mariners 38/2026
Beta look