AMBROSE CHANNEL - MAIN CHANNEL
General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes
Location: 40-41.53N 074-00.77W Mariners are advised of marine construction operations at the pedestrian bridge to the Hugh L. Carey Tunnel Ventilator on Governors Island, New York, NY, near position 40°41'31.88" N, 074°46.47" W. Operations are scheduled from November 25, 2026, through February 26, 2027. A 10X20 ft work barge and 36 ft safety boat will be on scene. The navigable waterway is not expected to be impeded; however, mariners are requested to exercise caution when transiting the area.
Valid 2026-11-23 to 2027-02-26.
USCG Northeast District Local Notice to Mariners 47/2026