MAIN CHANNEL - HUDSON RIVER
General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes
Location: 40-42.85N 074-01.08W Mariners are advised that Trevcon Construction Co. LLC will conduct waterfront construction for the Northwest Battery Park City Resiliency Project, Reach 04, on the Hudson River adjacent to 300 Vesey Street, New York, NY. Work is scheduled from February 24, 2027, through July 31, 2029, generally between 5:00 a.m. and 7:00 p.m.; certain operations may occur 24 hours a day, seven days a week. Operations include removal of existing structures, installation of an O-pile wall and steel pipe piles, jet grouting, dredging, precast installation, and concrete-deck installation. Construction equipment may include two 180-foot by 60-foot barges, two 140-foot by 50-foot barges, two 90-foot by 30-foot barges, and one 150-foot by 37-foot hopper barge. All vessel movements will be conducted by tugboat and may occur at any time. Mariners should use caution, proceed at a safe speed, maintain a safe distance from the work area, and contact project vessels on VHF-FM Channels 13, 16, or 65A/75A as necessary.
Valid 2026-12-31 to 2029-08-01.
USCG Northeast District Local Notice to Mariners 47/2026