PROVIDENCE RIVER APPROACH - PROVIDENCE RIVER
General / Marine Construction (Excluding Bridges) / Dredging
Location: 41-46.14N 071-23.17W 41-46.08N 071-23.17W 41-46.06N 071-23.25W 41-46.14N 071-23.26W 41-46.14N 071-23.17W Mariners are advised that OSM Marine will conduct Maintenance dredging inside marina basin of the Rhode Island Yacht Club with disposal of the material into the Providence River CAD cell. from November 18 through December 31, 2026. There will be 8 – 10 dumps over the course of the project. The primary work site is located near 41° 48’ 33.28′”N, 71°23’ 47.83′”W, with a lay barge positioned near Buoy 19 at approximately 41°01.3′ N, 73°07.1′ W. Vessels may contact project equipment on VHF-FM Channels 13 and 16. Mariners are urged to proceed at their slowest safe speed to minimize wake and use caution when passing.
Valid 2026-11-13 to 2026-12-31.
USCG Northeast District Local Notice to Mariners 47/2026