BEVERLY CHANNEL - BASS RIVER General / Bridges / Temp Deviation Construction of a temporary Hall-Whitaker Bridge is ongoing and anticipated to be complete no later than May 29, 2030. Until construction is complete, the Hall-Whitaker Bridge over the Bass River in Beverly, MA at mile 0.6 will remain in the closed position. Smaller vessels with adequate clearance beneath the existing moveable bridge in the closed position will be able to pass. Mariners are advised to exercise caution when transiting the area. Any concerned traffic can contact the project manager (MAS Building & Bridge) at (508) 918-3133, or Mass DOT Highway Division at (857) 443-6594. Position 42-32.98N 070-53.27W USCG Northeast District Local Notice to Mariners 45/2026