US Coast Guard LNM - Northeast District (D1) LNM01-4A47B3
Received: Source checked:
Keywords
- Geometry refscircle_radius
- Geometry phrasesradius
Message content
SECTOR NORTHERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) - HAMPTON HARBOR
General / LAA / RNA / Temporary Regulated Navigation Zone
The Coast Guard is establishing a temporary regulated navigation area (RNA) and a safety zone on the Hampton River at the inlet to Hampton Harbor, Hampton, NH, in response to hazardous conditions created by construction activities for the Neil R. Underwood Seabrook-Hampton Harbor Bridge replacement project. This rule is necessary to provide for the safety of life in the areas undergoing demolition and construction. The RNA will be enforced from July 1, 2025, through December 31, 2030, and will establish the following operating restrictions on vessels: Nothing in this regulation relieves any vessel, owner, operator, charterer, master, or person directing the movement of a vessel, from the consequences of any neglect to comply with this part or any other applicable law or regulation (i.e. the International Regulations for Prevention of Collisions at Sea, 1972 (72 COLREGS) or 33 CFR part 84—Subchapter E, Inland Navigation Rules) or of the neglect of any precaution which may be required by the ordinary practice of seamen, or by the special circumstances of the case. Entry and movement within the RNA is subject to a “Slow-No Wake” speed limit. All vessels may not produce a wake and may not attain speeds greater than five (5) knots unless a higher minimum speed is necessary to maintain bare steerageway. Any vessel transiting through the RNA must make a direct passage. No vessel may stop, fish, moor, anchor, or loiter within the RNA at any time. Vessels may not pass (overtake) another vessel within the RNA. Only one vessel is permitted to pass through the center span navigational channel at any given time. Except when transiting through the center span navigation channel, no vessel or craft may operate within 20 feet of the bridge(s). The operator of any vessel transiting in the RNA must comply with all lawful directions given to them by the COTP or the COTP's on-scene representative. viii) One-way traffic will flow northbound between the eastern side of the shallow waters and the Seabrook-Hampton Harbor Bridge. The northern side of the shallow area will accommodate one-way traffic moving west. The Safety Zone, includes all navigable waters within a 50-yard radius of the center point of the bridge, will be effective from July 1, 2025, through Decmember 31, 2030, but will only be enforced during active construction within the main span navigational channel or other instances which may cause a hazard to navigation as determined by the COTP. The COTP will make notification of the exact dates and times in advance of each closure period of the safety zone to the local maritime community through the Local Notice to Mariners and will issue a Broadcast Notice to Mariners via marine channel 16 (VHF-FM) as soon as practicable in response to an emergency. The complete rulemaking is available under Federal Register docket number USCG-2025-0389 and can be accessed through the federal portal at https://www.regulations.gov/document/USCG-2025-0389-0001 We invite your comments on this rulemaking. To submit your comment online, go to https://www.regulations.gov, and insert “USCG-2025-0389” in the “search box”. Click “Search” and then click “Comment.” We will consider all comments received on or before October 6, 2025. If the project is completed before December 31, 2030, enforcement of the safety zones will be suspended, and notice given via Local Notice to Mariners. The First Coast Guard District Local Notice to Mariners can be found at: https://www.navcen.uscg.gov/msi. For questions regarding this Marine Safety Information Bulletin contact Mr. Craig Lapiejko, Waterways Management at First Coast Guard District, telephone (571) 607-6314, e-mail: [email protected]. Matthew B. Stuck, First Coast Guard District Chief of Waterways Management, sends
Valid 2025-07-08 to 2030-12-31.
USCG Northeast District Local Notice to Mariners 47/2026