PISCATAQUA RIVER - LITTLE BAY General / Bridges / Rehabilitation Location: 43-07.09N 070-49.58W Bridge Name: General Sullivan Bridge Reed & Reed Inc. will be conducting bridge removal and temporary trestle construction operations in Little Bay, between Dover and Newington, NH, in position 43-07.08N 070-49.58W. Construction will run from June 5, 2026, to November 20, 2026, Monday through Saturday, between 6:30am to 6:30 pm, local time. Equipment on scene will be (2) 250-ton cranes, (1) 90-ton Rough Terrian Crane, (2) forklifts, (1) dump truck, (1) excavator, (1) loader, (2) safety boats, (2) work boats, (2) 90’ manlifts, monitoring VHF-FM CH 13 &16. Vessels will be directed through a temporarily reduced 160-foot-wide navigational channel marked by tow temporary red and two temporary green buoys. Navigation through the work zone will be maintained during normal operations whenever safe to do so. The channel is expected to be restricted from June 5, 2026, through November 20, 2026, due to construction of the final Newington trestle span. In addition, short-term channel closures of up to 4 hours will be required during Span 5 superstructure removal, currently scheduled between August 3, 2026, and August 31, 2026. Outside of active closure periods, passage through the work zone will be accommodated subject to site conditions and construction activity. Valid 2026-06-05 to 2026-11-20. USCG Northeast District Local Notice to Mariners 45/2026
Beta look