HomeMapWorld mapAlphaLearnNew
More
Account
Loading…
Language: English

US Coast Guard LNM - Northeast District (D1) LNM01-AB411E

SÉCURITÉ
Received: Source checked:
Subscribe
Show on map
Search

Keywords

  • Operationsmarine construction
Message content
SECTOR NORTHERN NEW ENGLAND, SUBMERGED LANDS ACT (SLA) - FRENCHMAN BAY General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes L Beginning May 18, 2026, and continuing until March 02, 2028, a Crane Barge along with an attendant plant will be operating at various locations in and around the Bar Harbor Breakwater located adjacent to Bald Porcupine Island and the Porcupine Dry Ledge. Materials will be delivered to this Crane Barge via Tug transit. The work zone in general extends approximately 300 feet on either the north or south sides of the existing breakwater rock structure. Mariners are urged to transit at their slowest safe speed to minimize wake and procced with caution when travelling near the work area. When construction vessels are to navigate to the Bar Harbor breakwater they shall follow a designated haul route to minimize any disruptions to local marine traffic or fishermen. Vessels shall enter the harbor on a course of 343°. Upon reaching vertex of N 264340.78, E 1069401.28 (northeast of Bald Porcupine Island) they shall alter course to a heading of 270°. They will then continue at this heading until reaching a vertex of N264340.78, E 1067401.28 where they shall set a heading of 210° and maintain this heading to enter the work zone. The work zone in general extends approximately 300 feet on either the north or south sides of the existing breakwater rock structure. Its vertices are: Northeast corner: N 262830.48, E 1066588.92, Southeast corner: N 262354.34, E 1066858.96, Northwest corner: N 261413.24, E 1064383.15, Southwest corner: N 260917.96, E 1064721.87. When leaving the work zone any vessels shall navigate the course described above with opposite headings. Should any construction vessels need to leave the work zone for safe harbor they shall exit the work zone at its northeast corner (N 262830.48, E 1066588.92) on a course heading of 0° until reaching a vertex of N 268623.87, E 1066472.54 and start a heading of 45°. A safe harbor point shall be N 269679.20, E 1067527.92 which is west of Burnt Porcupine Island. An alternate safe harbor spot shall continue on the same course until reaching vertex N 270669.19, E 1068517.87 and then alter course to heading 148° until reaching safe harbor at N 269494.97, E 1070376.68. This safer harbor location is between Burnt Porcupine Island and Long Porcupine Island, east of Rum Key. Vessels may leave this safe harbor location on a heading of 210° back into the work zone. The above described safe harbor locations may be reached in the opposite direction if chosen. The Crane Barge will not be sitting in the federally marked navigation channel while repairing the breakwater. Should any construction vessels need to leave the work zone for safe harbor they shall exit the work zone and travel across the navigation channel to a designated safe harbor point that is located west of Burnt Porcupine Island. An alternate designated safe harbor point is located between Burnt Porcupine Island and Long Porcupine Island, east of Rum Key. The crew will be working Monday through Friday during daylight hours. The Crane and attendant plant will both monitor marine VHF Channel 16. Mariners are urged to use extreme caution and transit the area at a safe speed. If you have any questions or require additional information, please contact me via e-mail at [email protected] or via telephone at (609) 364-2078. Valid 2026-05-18 to 2028-03-31. USCG Northeast District Local Notice to Mariners 47/2026
Beta look