BUZZARDS BAY MAIN CHANNEL - WEWEANTIC RIVER
General / Marine Construction (Excluding Bridges) / Dredging
Location: 41-44.96N 070-42.30W AGM Marine Contractors, will be conducting dredging operations in the Wareham River, Wareham, Massachusetts, in position 41-44.96N 070-42.30W. The project is scheduled to run from July 1, 2026, through September 31, 2026, and will operate continuously, seven days a week, 24 hours per day. The equipment involved includes the Dredge Triton, crane, scow, and tugs. To ensure safe navigation, vessels in the area can contact the operation on radio frequency 66 and are advised to provide a 15-minute notice for passing arrangements, with the dredging vessel remaining out of the channel when necessary.
Valid 2026-06-17 to 2026-10-01.
USCG Northeast District Local Notice to Mariners 41/2026