US Coast Guard LNM - Northeast District (D1) LNM01-0DBF4E
SÉCURITÉReceived: Source checked:
Keywords
- Operationsmarine construction
- Geometry refsbounded
- Geometry phrasesbounded by
Message content
MAIN CHANNEL - HUDSON RIVER
General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes
From November 24, 2024, through January 20, 2027, Weeks Marine and Frontier-Kemper Tutor Perini JV will conduct marine construction in the Hudson River on behalf of the Hudson Tunnel Project. The construction area is bounded by the following positions off the Manhattan bulkhead: 40-45.34N 074-00.40W; 40-45.31N 074-00.80W; 40-45.23N 074-00.81W; 40-45-12.40N. 074-00-28.47W. The USCG has established a Safety Zone, 33 CFR 165.T01-0336 Safety Zone; Hudson River, Manhattan, NY. Mariners transiting west of the safety zone should proceed at a speed to minimize potential wake or surge damage to the vessels working the construction area. There are two distinct jobsites within the construction area. The first jobsite, which is operated by Weeks Marine, is west of Pier 66. Within this jobsite, Weeks Marine is conducting soil mixing within a 110’ wide x 600’ long cofferdam for the Hudson River Ground Stabilization (HRGS) Project. Work hours are approximately 7AM – 7PM, Monday through Friday, and 7AM – 3PM, Saturday. The cofferdam is marked with FL W 4s lights at each corner and at 30 ft intervals, and with white retro-reflective tape 6” high and at least 4’ long is installed above the MHHW mark every 50 feet on the cofferdam. The The Weeks 526 (AIS- WEEKS 526) will be on the northern side of the cofferdam and will be advancing the cofferdam east. Weeks 526 barge will remove piles from the west end, lay them down on barges, shift east, and reinstall them. The Weeks 526 barge monitors VHF-FM channels 13 / 16 / 66. The Weeks 263 barge (AIS- WEEKS 263) and material barges will be on the outside of the cofferdam to support mixing and coring operations within the cofferdam. The Weeks 263 barge monitors VHF-FM channels 13 / 16 / 67. The second jobsite, which is north of Pier 66 in close proximity to the Manhattan bulkhead and near position 40-45.25N 074-00.47W, is operated by Frontier-Kemper Tutor Perini JV. Within this jobsite, Posillico Civil has constructed a 200 ft x 150 ft temporary marine structure to facilitate grouting and freezing operations to stabilize the ground beneath the Manhattan bulkhead in preparation for tunnel boring. The 150 ft x 50 ft Joseph D barge with a 184 ft crane on deck will be moored along the west face of the temporary marine structure. The 150 ft x 150 ft scow Angela will be moored on west side of the Joseph D barge. All barges require tug assistance for a movement and a minimum notice of 24 hours via VHF radio is required for any barge relocation. All moored barges display fixed white lights in accordance with the Inland Navigation Rules. Five seasonal white lighted buoys now mark the USCG Safety Zone. Two (LLNR 37663, 37663.1) are upriver of the construction area, two (LLNR 37663.2, 37663.3) are downriver and one (LLNR 37663.4) is to the west. All five lighted buoys exhibit FL W 2.5s characteristics.
Valid 2026-01-06 to 2027-01-21.
USCG Northeast District Local Notice to Mariners 47/2026