MAIN CHANNEL - HUDSON RIVER
General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes
Location: 41-59.02N 073-57.11W Bank Stabilization operations will be conducted north of the Kingston Rhinecliff Bridge off the west side of the Hudson River in position 41-59.02N 073-57.16W, from February 17, 2026, to January 28, 2031. Work will be conducted withing the Town of Ulster allowable work hours between 7:00 am to 10:00 pm. Equipment on scene will be, Long reach excavators from upland at first and possibly on a barge if necessary. All work will be within the existing cove. The work will be within the existing cove off the Hudson River and will not interfere with the channel. The installation of a 44-foot by 8-foot floating pier, attached to a bulkhead by a 36-foot by 4-foot gangway. Three (3) finger piers, approximately 36-feet by 6-feet each, will extend from the main floating pier. The entire pier assembly will be held in place by five (5) plastic, 16-inch-diameter piles, each installed by vibratory hammer. The dredging of a total of approximately 1,429 cubic yards of material, over an area of approximately 12,500 square feet. All dredged material will be disposed of within a contained upland disposal area on the property.
Valid 2026-02-17 to 2031-01-29.
USCG Northeast District Local Notice to Mariners 47/2026