HomeMapSky mapAlpha
More
Account
Loading…
Language: English

NAVAREA II - 398/2026

SÉCURITÉ
Issued: 14 Nov 2026, 15:59Last modified: 14 Nov 2026, 20:00

analysis

Scheduledstarts 18 Nov 2026, 00:00 UTC (in 3 days)

Pipe works in the Strait of Gibraltar, 18 Nov-5 Dec

Pipe operation in the Strait of Gibraltar by M/V STRIL SERVER using an ROV along a line joining two positions. Activity valid from 18 Nov 2026 to 05 Dec 2026. Mariners are requested to give a wide berth and navigate with caution in the area.

Type
Cable / pipeline work · severity moderate
Feed
Cable and pipeline operationsAll warnings of this kind on the map (contributors), or as an API feed: /api/v2/feeds/cables/
Location
Gibraltar Strait
Validity
From 18 Nov 2026, 00:00 UTC
Until 05 Dec 2026, 23:59 UTCValid from 18 Nov 2026 to 05 Dec 2026
Activity periods
  • 18 Nov 2026, 00:00 UTC - 05 Dec 2026, 23:59 UTC (Pipe operation by M/V STRIL SERVER with ROV along stated line)
Hazards
pipe operations, ROV operations, work vessel alongside pipe

Generated automatically from the warning text on 14 Nov 2026, 16:00 UTC. It can be wrong: the original warning below is the authoritative text.

The whole analysis comes with Lagom

This warning's analysis also has:

  • Action for mariners
  • Keep-clear distance
  • Ships named
  • Translations
  • Nearby lights and rescue centres

The action for mariners, the keep-clear distance, contacts, ships named, translations and the nearby lights and rescue centres come with Lagom and every higher plan, and with the API plans. The official warning text above is always free.

Keywords

  • Operationswide berth requested
  • Geometry refsline
  • Geometry phrasesline joining
Message content
GIBRALTAR STRAIT Works: operation on pipe Valid from 18 Nov 2026 to 05 Dec 2026 By M/V STRIL SERVER with ROV along line joining 36-06.64N 005-52.21W, 35-45.14N 005-56.96W. Wide berth requested

Related messages

  • 399/2026
  • 397/2026
  • 396/2026
  • 395/2026(archived)
  • 394/2026(archived)
Beta look