GER-606/26
Geotechnical operations northwest of Baltic Eagle wind farm
ActiveReceived 01 Nov 2026, 09:30 UTC
Warning text
Positions open on the mapLocation map
Open in the full mapAnalysis
ActiveGeotechnical operations are being conducted northwest of the Baltic Eagle offshore wind farm around position 54-52,8N 013-46,0E. Vessels involved are MV 'NG DRILLER' and CS 'ICEA'. A safety distance of 0,5 NM is required.
Keep a safe distance of 0,5 NM from the operation and navigate with caution.
- Type
- Offshore operations · severity moderate
- Feed
- Offshore works, rigs and towingAll warnings of this kind on the map, or as an API feed.
- Location
- Southern Baltic, northwest of Baltic Eagle offshore wind farm
- Hazards
- geotechnical operations, work vessels and associated equipment, safety zone
- Keep clear
- 0.5 NMA SAFETY DISTANCE OF 0,5 NM IS REQUIRED.
Vessels involved
- MV 'NG DRILLER' · work vessel
- CS 'ICEA' · support vessel
Coast stations for this area
- RCCJRCC DenmarkDenmark143 NM from the area
- RCCMRCC GdyniaPoland168 NM from the area
- RCCJRCC SwedenSweden179 NM from the area
- DSCDSC Station ArkonaMRCC BremenGermanyMMSI 002111240VHF 31range 31 NM19 NM from the area
- DSCDSC Station RügenMRCC BremenGermanyMMSI 002111240VHF 27range 27 NM32 NM from the area
- DSCDSC Station GislovshammarJRCC SwedenSwedenMMSI 002653000MF 210range 210 NM40 NM from the area
- DSCDSC Station AarsballeJRCC DenmarkDenmarkMMSI 002191000VHF 42range 42 NM41 NM from the area
- DSCDSC Station LyngbyJRCC DenmarkDenmarkMMSI 002191000VHF, MF41 NM from the area
Worked out automatically from the warning text on 01 Nov 2026, 09:47 UTC. It can be wrong: the official warning text is the authority.