NW 492/26
Cable-laying operations between Sharm el-Sheikh and Ras Gharib, Red Sea (26 Oct-10 Dec 2026)
Warning text
Positions open on the mapLocation map
Open on the full mapAnalysis
Activeuntil 10 Dec 2026, 23:59 UTC (in 23 days)The M/V "OCEAN CONNECTOR" is carrying out extension and landing works of the marine connection "FESTOON" for Power Sub-Link (PSL) Co. in the Red Sea between Sharm el-Sheikh and Ras Gharib. Operations are reported from 26/10/2026 until 10/12/2026 at the listed positions. Mariners are advised to navigate with caution in the area for their safety and the safety of navigation.
- Type
- Cable / pipeline work · severity moderate
- Feed
- Cable and pipeline operationsAll warnings of this kind on the map, or as an API feed.
- Location
- Red Sea, between Sharm el-Sheikh and Ras Gharib
- Validity
- From 26 Oct 2026, 00:00 UTC
Until 10 Dec 2026, 23:59 UTCFrom: 26/10/2026 Until 10/12/2026 - Activity periods
- 26 Oct 2026, 00:00 UTC - 10 Dec 2026, 23:59 UTC (From: 26/10/2026 Until 10/12/2026)
- Hazards
- subsea cable/power link laying, work vessel operations
Worked out automatically from the warning text on 17 Nov 2026, 18:07 UTC. It can be wrong: the official warning text is the authority.
The whole analysis comes with Lagom
This warning's analysis also has:
- Action for mariners
- Ships named
- Charts
- Translations
- Nearby lights and rescue centres
The action for mariners, the keep-clear distance, contacts, ships named, translations and the nearby lights and rescue centres come with Lagom and every higher plan, and with the API plans. The official warning text above is always free.