HomeMapSky mapAlpha
More
Account
Loading…
Language: English

NW 492/26

Cable-laying operations between Sharm el-Sheikh and Ras Gharib, Red Sea (26 Oct-10 Dec 2026)

Activeuntil 10 Dec 2026, 23:59 UTC (in 23 days)Received 26 Oct 2026, 00:00 UTC

Warning text

Positions open on the map
26 OCT. 26. Serapeume Radio NAVAREA IX N W 492/26 RED SEA Chart No.: 159 . - The M/V "OCEAN CONNECTOR" is carrying out the extending and landing actions of the marine connection "FESTOON" for "Power Sub-Link (PSL) CO.", starting from the sea landing point in "SHARM EL-SHEIKH "to "RAS GHARIB" From: 26/10/2026 Until 10/12/2026 in the following position.: No. Area Lat Long 1 RAS GHARIB 28-22.620N 033-05.531E 2 28-23.253N 033-07.050E 3 28-24.263N 033-13.040E 4 28-24.343N 033-16.043E 5 28-24.336N 033-16.272E 6 28-24.229N 033-16.771E 7 28-21.294N 033-21.770E 8 28-19.502N 033-23.805E 9 28-17.180N 033-26.834E 10 28-16.658N 033-28.021E 11 28-16.095N 033-28.611E 12 28-09.528N 033-35.753E 13 28-04.914N 033-37.400E 14 27-59.307N 033-40.285E 15 27-57.039N 033-41.902E 16 27-56.690N 033-42.262E 17 27-53.895N 033-44.263E - Mariners are advised to navigate with caution in their area for their own safety and safety of Navigation.

Analysis

Activeuntil 10 Dec 2026, 23:59 UTC (in 23 days)

The M/V "OCEAN CONNECTOR" is carrying out extension and landing works of the marine connection "FESTOON" for Power Sub-Link (PSL) Co. in the Red Sea between Sharm el-Sheikh and Ras Gharib. Operations are reported from 26/10/2026 until 10/12/2026 at the listed positions. Mariners are advised to navigate with caution in the area for their safety and the safety of navigation.

Type
Cable / pipeline work · severity moderate
Feed
Cable and pipeline operationsAll warnings of this kind on the map, or as an API feed.
Location
Red Sea, between Sharm el-Sheikh and Ras Gharib
Validity
From 26 Oct 2026, 00:00 UTC
Until 10 Dec 2026, 23:59 UTCFrom: 26/10/2026 Until 10/12/2026
Activity periods
  • 26 Oct 2026, 00:00 UTC - 10 Dec 2026, 23:59 UTC (From: 26/10/2026 Until 10/12/2026)
Hazards
subsea cable/power link laying, work vessel operations

Worked out automatically from the warning text on 17 Nov 2026, 18:07 UTC. It can be wrong: the official warning text is the authority.

The whole analysis comes with Lagom

This warning's analysis also has:

  • Action for mariners
  • Ships named
  • Charts
  • Translations
  • Nearby lights and rescue centres

The action for mariners, the keep-clear distance, contacts, ships named, translations and the nearby lights and rescue centres come with Lagom and every higher plan, and with the API plans. The official warning text above is always free.

Beta look