HomeMapWorld mapAlphaLearnNew
More
Account
Loading…
Language: English

Singapore PMN 144/2026

Received: Source checked:
Subscribe
Show on map
Search

analysis

Scheduledstarts 01 Dec 2026, 00:00 UTC (in 8 days)

Maintenance dredging at Omlub Jetty / ExxonMobil, Northern Tuas Basin (West Jurong Channel)

Maintenance dredging and dumping operations will take place at Omlub Jetty / ExxonMobil in the Northern Tuas Basin, West Jurong Channel. Works are conducted 24 hours daily from 01 Dec 2026 to 31 Jan 2027. This notice gives vessel names and contact details and instructs mariners to keep well clear and monitor VHF Channel 22.

Type
Dredging / works · severity moderate
Feed
Offshore works, rigs and towingAll warnings of this kind on the map (contributors), or as an API feed: /api/v2/feeds/offshore/
Location
Omlub Jetty / ExxonMobil; Northern Tuas Basin, vicinity of West Jurong Channel
Validity
From 01 Dec 2026, 00:00 UTC
Until 31 Jan 2027, 23:59 UTCWith effect from 01 Dec 2026 to 31 Jan 2027. Working Hours: 24 hours daily, including Sundays and public holidays.
Activity periods
  • 01 Dec 2026, 00:00 UTC - 31 Jan 2027, 23:59 UTC (24 hours daily)
Hazards
maintenance dredging, grab dredger and work barge operations, dumping operations, restricted working area, vessels and barges on site

Generated automatically from the warning text on 17 Nov 2026, 07:31 UTC. It can be wrong: the original warning below is the authoritative text.

The whole analysis comes with Lagom

This warning's analysis also has:

  • Action for mariners
  • Keep-clear distance
  • Contacts
  • Ships named
  • Translations
  • Nearby lights and rescue centres

The action for mariners, the keep-clear distance, contacts, ships named, translations and the nearby lights and rescue centres come with Lagom and every higher plan, and with the API plans. The official warning text above is always free.

Keywords

  • Geometry refsbounded, circle_radius, polygon
  • Geometry phrasesarea bounded, bounded by, within
Message content
MARITIME AND PORT AUTHORITY OF SINGAPORE PORT MARINE NOTICE NO. 144 OF 2026 17 Nov 2026 Shipping Community Harbour Craft Community Pleasure Craft Community DREDGING WORKS AT OMLUB JETTY/ EXXONMOBIL Applicable to: Mariners operating in the vicinity of West Jurong Channel Date : With effect from 01 Dec 2026 to 31 Jan 2027. Location : At sea, within the working area bounded by the following coordinates (see attached chartlet): (WGS 84 Datum) Point Latitude (N) Longitude (E) 1 1° 17’ 964 103° 41’ 324 2 1° 17’ 950 103° 41’ 308 3 1° 17’ 948 103° 41’ 313 4 1° 17’ 954 103° 41’ 320 5 1° 17’ 951 103° 41’ 350 6 1° 17’ 947 103° 41’ 349 7 1° 17’ 939 103° 41’ 357 8 1° 17’ 939 103° 41’ 370 9 1° 17’ 949 103° 41’ 371 10 1° 17’ 961 103° 41’ 361 11 1° 17’ 964 103° 41’ 361 12 1° 17’ 967 103° 41’ 325 Working Hours : 24 hours daily, including Sundays and public holidays. Craft: Name Harbour Craft License No. Description SOON LI 18 SR 3661 G Dredger STL PT 4 SR 3860 A Work Boat STL H 8 SR 3641 B Work Barge STL PT 1 ST 1531 E Tug Boat STL PT 2 ST 1533 A Tug Boat QSA AB 7 SR 2854 A Anchor Boat These craft will exhibit the appropriate local and international day and night signals. Details : Maintenance Dredging Works at OMLUB Jetty shall be carried out using grab dredger and self-propelled work barge for dumping works in Northern Tuas Basin. Further enquiries relating to the project can be directed to Zulkifli Matson, Project Manager at Tel: 92317887 Email : [email protected] Caution : When in the vicinity of the working area, mariners are reminded to: a) Keep well clear and not to enter the working area; b) Maintain a proper lookout; c) Proceed at a safe speed and navigate with caution; d) Maintain a listening watch on VHF Channel 22 (Jurong Control); and communicate with Jurong Control for assistance if required. Please call Capt. Hazel Leo at Tel: +65 6325 2465 or Marine Safety Control Centre (MSCC) Duty Officer at +65 6325 2488/2489 for clarification on this Port Marine Notice. CAPT CHONG JIA CHYUAN PORT MASTER MARITIME AND PORT AUTHORITY OF SINGAPORE
Beta look