HomeMapWorld mapAlphaLearnNew
More
Account
Loading…
Language: English

Singapore PMN 91/2015

Received: Source checked:
Subscribe
Show on map
Search

analysis

Active

Revised tug assignment: two big tugs for 300m+ container ships in Singapore terminals

The Maritime and Port Authority of Singapore revised tug assignment guidelines. From 01 Oct 2015, container ships 300 metres and more with working bow thrusters will be assigned two big tugs for berthing and unberthing at all container terminals. Details and pilotage guidelines are provided on MPA website links. Contact provided for clarification.

Type
Port / channel notice · severity low
Location
Singapore container terminals (Tanjong Pagar, Keppel Harbour, Brani, Pasir Panjang, Jurong)
Validity
From 01 Oct 2015, 00:00 UTC
With effect from 01 Oct 2015
Hazards
tug assignment requirement

Generated automatically from the warning text on 30 Sept 2026, 12:37 UTC. It can be wrong: the original warning below is the authoritative text.

The whole analysis comes with Lagom

This warning's analysis also has:

  • Action for mariners
  • Contacts
  • Translations

The action for mariners, the keep-clear distance, contacts, ships named, translations and the nearby lights and rescue centres come with Lagom and every higher plan, and with the API plans. The official warning text above is always free.

Message content
MARITIME AND PORT AUTHORITY OF SINGAPORE PORT MARINE NOTICE NO. 91 OF 2015 17 Aug 2015 Shipping Community REVISION OF TUG ASSIGNMENT GUIDELINES FOR MEGA-CONTAINER SHIP BERTHING AND UNBERTHING AT CONTAINER TERMINALS The Maritime and Port Authority of Singapore (MPA) has revised the tug assignment guidelines to enhance navigational safety in the port. 2 With effect from 01 Oct 2015, container ships that are 300 metres and more in length, and are equipped with working bow thruster(s), will be assigned 2 big tugs for berthing and unberthing at all container terminals. 3 Details of the revised tug assignment guidelines can be found in the pilotage guidelines for the respective container terminals at the following links: a. Tanjong Pagar, Keppel Harbour, and Brani Terminals http://www.mpa.gov.sg/web/wcm/connect/www/d8bbaa88-7558-4925- 82c2- 2ff9351a1065/tanjongpagar_keppel_brani_terminals.pdf?MOD=AJPERES b. Pasir Panjang Terminal http://www.mpa.gov.sg/web/wcm/connect/www/f5206701- 1174-4648-837b- 9ea39bb920a1/pasir_panjang_terminal.pdf?MOD=AJPERE S c. Jurong Terminal http://www.mpa.gov.sg/web/wcm/connect/www/e19 a9068-5ca8-4f20-9fba- ba3413922187/jurong_terminal.pdf?MOD=AJPERE S 4 Please call Mr Lawrence Koo at Tel: 6325-2475 for clarification on this Port Marine Notice. DAKNASH GANASEN PORT MASTER MARITIME AND PORT AUTHORITY OF SINGAPORE Links updated on 26 Sep 2016
Beta look