HomeMapWorld mapAlphaLearnNew
More
Account
Loading…
Language: English

Singapore PMN 70/2026

SÉCURITÉ
Received: Source checked:
Subscribe
Show on map
Search

analysis

Activeuntil 02 Jan 2027, 23:59 UTC (in 41 days)

Pulau Ubin shoreline restoration works with working areas along island

Construction and shoreline restoration works will take place along the shores of Pulau Ubin within specified working areas. Activities involve work barges assisted by tugboats and a safety boat in attendance. Works are effective from 03 Jul 2026 to 02 Jan 2027, with daily working hours 0800Hrs to 1900Hrs. Mariners are to keep clear, maintain lookout, safe speed and a listening watch on VHF Channel 21 (Sembawang Control).

Type
Offshore operations · severity moderate
Feed
Offshore works, rigs and towingAll warnings of this kind on the map (contributors), or as an API feed: /api/v2/feeds/offshore/
Location
Along the shores of Pulau Ubin (working areas A-D: Sungai Besar, Noordin Beach, Mamam Beach, Sungai Durian)
Validity
From 03 Jul 2026, 00:00 UTC
Until 02 Jan 2027, 23:59 UTCDate : With effect from 03 Jul 2026 to 02 Jan 2027. Working Hours: From 0800Hrs to 1900Hrs daily, including Sundays and Public Holidays.
Activity periods
  • ? - ? (Daily 0800Hrs to 1900Hrs (working hours as stated))
Hazards
construction works, work barges, tugboats, safety boat in attendance, restricted/keep-clear working areas
Cancels
Port Marine Notice No. 16 of 2026

Generated automatically from the warning text on 30 Sept 2026, 11:02 UTC. It can be wrong: the original warning below is the authoritative text.

The whole analysis comes with Lagom

This warning's analysis also has:

  • Action for mariners
  • Contacts
  • Ships named
  • Translations
  • Nearby lights and rescue centres

The action for mariners, the keep-clear distance, contacts, ships named, translations and the nearby lights and rescue centres come with Lagom and every higher plan, and with the API plans. The official warning text above is always free.

Keywords

  • Geometry refsbounded, circle_radius
  • Restricted Areakeep clear of
  • Geometry phrasesbounded by, within
Message content
MARITIME AND PORT AUTHORITY OF SINGAPORE PORT MARINE NOTICE NO.70 OF 2026 13 May 2026 Shipping Community Harbour Craft Community Pleasure Craft Community PULAU UBIN SHORELINE AND MANGROVE RESTORATION WORKS Applicable to: Mariners operating along the Pulau Ubin shoreline This PMN supersedes Port Marine Notice No. 16 of 2026. The working period has been extended, and the list of crafts has been revised. Date : With effect from 03 Jul 2026 to 02 Jan 2027. Location : Along the shores of Pulau Ubin, within the working areas bounded by the following co-ordinates (see attached chartlet): (WGS 84 Datum) Working Area A- (Sungai Besar) Point Latitude (N) Longitude (E) 1 1°25.076” 103°57.460” 2 1°25.091” 103°57.463” 3 1°25.083” 103°57.595” 4 1°25.059” 103°57.595” Working Area B- (Noordin Beach) 5 1°25.064” 103°57.710” 6 1°25.120” 103°57.710” 7 1°25.185” 103°57.905 8 1°25.188” 103°58.087” 9 1°25.153” 103°58.087” Working Area C - (Mamam Beach) Point Latitude (N) Longitude (E) 10 1°25.093” 103°58.439” 11 1°25.155” 103°58.450” 12 1°25.105” 103°58.733” 13 1°25.115 103°58.840” 14 1°25.077 103°58.840” Working Area D - (Sungai Durian) 15 1°24.497” 103°58.719” 16 1°24.483” 103°58.726” 17 1°24.402” 103°58.608” 18 1°24.408” 103°58.600” Working Hours Craft : : From 0800Hrs to 1900Hrs daily, including Sundays and Public Holidays. Please refer to ANNEX A for the list of crafts approved for deployment in the working area. These craft will exhibit the appropriate local and international day and night signals. Details : Construction works along the shoreline will be carried out by work barges, assisted by tugboats. A safety boat will be in attendance at all times to warn and direct craft in the vicinity to keep clear of the working areas. Further enquiries relating to the project can be directed to: Mr. S.Palanivel, Deputy Project Manager, Tel: +65 8695 6117, email: [email protected] or Mr. Jimmy Choo, Construction Manager, Tel: +65 8686 4066, email: [email protected] Caution : When in the vicinity of the respective working areas, mariners are reminded to: a) Keep well clear and not to enter the working areas; b) Maintain a proper lookout; c) Proceed at a safe speed and navigate with caution; d) Maintain a listening watch on VHF Channel 21 (Sembawang Control); and Communicate with Sembawang Control for assistance, if required. Please call Capt. Hazel Leo at Tel: +65 6325 2465 or Marine Safety Control Centre (MSCC) Duty Officer at +65 6325 2488/2489 for clarification on this Port Marine Notice. CAPT CHONG JIA CHYUAN PORT MASTER MARITIME AND PORT AUTHORITY OF SINGAPORE
Beta look