Singapore PMN 126/2026
SÉCURITÉanalysis
Activeuntil 15 Dec 2026, 23:59 UTC (in 23 days)Submarine cable installation off Tuas South and TSS westbound lane
Cable laying works by barge ASEAN Protector within a bounded area off Tuas South and the TSS westbound lane. Safety zone: 150-metre radius around the barge; works 24 hours daily. Effective 30 Sep 2026 to 15 Dec 2026. Mariners must keep clear, maintain lookout and monitor VHF channels for guidance.
- Type
- Cable / pipeline work · severity moderate
- Feed
- Cable and pipeline operationsAll warnings of this kind on the map (contributors), or as an API feed: /api/v2/feeds/cables/
- Location
- Tuas South and Traffic Separation Scheme (TSS) Westbound Lane; working area bounded by listed coordinates
- Validity
- From 30 Sept 2026, 00:00 UTC
Until 15 Dec 2026, 23:59 UTCWith effect from 30 Sep 2026 to 15 Dec 2026. - Activity periods
- 30 Sept 2026, 00:00 UTC - 15 Dec 2026, 23:59 UTC (24 hours daily)
- Hazards
- submarine cable installation, 150-metre safety zone around cable-laying barge, workcraft operating in area
Generated automatically from the warning text on 30 Sept 2026, 10:08 UTC. It can be wrong: the original warning below is the authoritative text.
The whole analysis comes with Lagom
This warning's analysis also has:
- Action for mariners
- Keep-clear distance
- Contacts
- Ships named
- Translations
- Nearby lights and rescue centres
The action for mariners, the keep-clear distance, contacts, ships named, translations and the nearby lights and rescue centres come with Lagom and every higher plan, and with the API plans. The official warning text above is always free.
Keywords
- Operationscable laying
- Geometry refsbounded, circle_radius, joining_lane, polygon
- Geometry phrasesarea bounded, bounded by, radius, traffic separation scheme