MPB-26ED6B17
SÉCURITÉSeabed scour protection works at Yunlin Offshore Wind Farm, Taiwan (2-31 Oct 2026)
No longer in forceReceived 01 Oct 2026, 00:00 UTCArchived 01 Nov 2026, 12:31 UTC
Warning text
Analysis
No longer in forceSeabed scour protection works will be conducted at the Yunlin Offshore Wind Farm by Yunneng Wind Power Co., Ltd. Activity is scheduled from 2 October to 31 October 2026. Vessels transiting the project area are advised to exercise caution. No specific safety distances or contact details are given in the notice.
Navigate with caution when transiting the Yunlin Offshore Wind Farm area and maintain a proper lookout.
- Type
- Offshore operations · severity moderate
- Feed
- Offshore works, rigs and towingAll warnings of this kind on the map, or as an API feed.
- Location
- Yunlin Offshore Wind Farm (Taiwan)
- Validity
- From 02 Oct 2026, 00:00 UTC
Until 31 Oct 2026, 23:59 UTCFROM OCTOBER 2 TO OCTOBER 31, 2026. - Activity periods
- 02 Oct 2026, 00:00 UTC - 31 Oct 2026, 23:59 UTC (Seabed scour protection works at Yunlin Offshore Wind Farm)
- Hazards
- seabed scour protection works, underwater works
Worked out automatically from the warning text on 01 Oct 2026, 03:57 UTC. It can be wrong: the official warning text is the authority.
Keywordsoffshore operations