HomeMapSky mapAlpha
More
Account
Loading…
Language: English

MPB-5A026257

Work and weather buoys deployed nearshore at Formosa 4 Offshore Wind Farm

Activeuntil 30 Jun 2027, 23:59 UTC (in 226 days)Received 22 Sept 2026, 00:00 UTC

Warning text

FORMOSA 4 WIND POWER CO., LTD. IS CONDUCTING “HORIZONTAL DIRECTIONAL DRILLING FOR THE NEARSHORE SECTION OF THE SUBMARINE CABLE CORRIDOR AT THE FORMOSA 4 OFFSHORE WIND FARM” Source:In accordance with the email notification from Formosa 4 Wind Power CO., LTD. dated September 22, 2026. 1.Formosa 4 Wind Power CO., LTD. has completed the nearshore section of the submarine cable corridor for the Formosa 4 Offshore Wind Farm. To facilitate subsequent marine surveys and on-site marking identification requirements, four work buoys have been deployed approximately two meters above the seabed. Additionally, the weather buoy deployed in accordance with the company’s letter dated June 9, 2026 (Ref. No. Formosa 4 Wind Power CO., LTD., letter No. 1150500028 dated June 9, 2026.) remains operational on-site to collect real-time local marine and meteorological data. The aforementioned buoys are scheduled to be deployed from September 18, 2026, to June 30, 2027. 2.For details, please see the attached document. All vessels transiting the area are advised to navigate with extreme caution. MPB notice 333-SRY8105-20260922002

Analysis

Activeuntil 30 Jun 2027, 23:59 UTC (in 226 days)

Formosa 4 Wind Power Co., Ltd. reports deployment of four work buoys and one weather buoy in the nearshore submarine cable corridor at the Formosa 4 Offshore Wind Farm. The buoys were deployed from 18 September 2026 and will remain in place until 30 June 2027 to support surveys and marking identification. Vessels transiting the area are advised to navigate with extreme caution. Details referenced in company notification dated 22 September 2026.

Type
Cable / pipeline work · severity moderate
Feed
Cable and pipeline operationsAll warnings of this kind on the map, or as an API feed.
Location
Formosa 4 Offshore Wind Farm, nearshore submarine cable corridor
Validity
From 18 Sept 2026, 00:00 UTC
Until 30 Jun 2027, 23:59 UTCThe aforementioned buoys are scheduled to be deployed from September 18, 2026, to June 30, 2027.
Activity periods
  • 18 Sept 2026, 00:00 UTC - 30 Jun 2027, 23:59 UTC (Buoys deployed to support marine surveys and on-site marking)
Hazards
work buoys deployed above seabed, weather buoy in place, submarine cable corridor marking

Worked out automatically from the warning text on 30 Sept 2026, 10:00 UTC. It can be wrong: the official warning text is the authority.

The whole analysis comes with Lagom

This warning's analysis also has:

  • Action for mariners
  • Lights and buoys affected
  • Translations

The action for mariners, the keep-clear distance, contacts, ships named, translations and the nearby lights and rescue centres come with Lagom and every higher plan, and with the API plans. The official warning text above is always free.

Beta look