LAKE MICHIGAN - UPPER GREEN BAY
General / Bridges / Construction
WI - LAKE MICHIGAN – Fox River From September 14 through October 12, 2026, between the hours of 0730 and 1900, Monday through Friday, a 60-foot by 30-foot barge will be working at the Proposed Brown County South Connector Bridge at Mile 9.94, over the Fox River. The barge will monitor VHF-FM Marine Radio Channel 16 for passing arrangements. [12AUG26]
Position 44-26.43N 088-03.98W
USCG Great Lakes District Local Notice to Mariners 40/2026