LAKE MICHIGAN - UPPER GREEN BAY
General / Bridges / Maintenance
*****REVISED***** WI - LAKE MICHIGAN – Fox River from October 8, 2026, through April 8, 2027, the Wisconsin Street Bridge at mile 56.72 over the Fox River will be secured to masted navigation and scaffolding that hangs approximately 4-feet will be installed under the bridge. Vessels able to pass under the bridge safely, without an opening may do so at any time. [02/24] [03/24]
Position 44-01.10N 088-33.07W
USCG Great Lakes District Local Notice to Mariners 45/2026