LAKE MICHIGAN - MILWAUKEE
General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes
There is a 100 ft barge conducting construction on the east end of the South Shore Cruise Dock. The standard working hours for the barge will be Monday through Saturday 6:00 am to 6:00 pm. If necessary, the barge will move out of the way. Mariners may contact the barge on VHF channel 16. Mariners are reminded to transit the area with caution and if possible, maintain a safe distance from the barge.
Valid 2026-09-01 to 2026-09-25.
Position 43-00.40N 087-53.15W
USCG Great Lakes District Local Notice to Mariners 38/2026