LOWER MISSISSIPPI RIVER - ILLINOIS RIVER
General / Marine Construction (Excluding Bridges) / Facilities, Barriers, Manmade Reefs, Riprap, Jetties / Dikes
Continuing until December 20, 2026, J.F. Brennan Company, Inc., will be performing construction operations on the left descending bank at Alto Pekin Grain Dock on the Illinois River, Mile 151.4. Operations will be conducted from 7:00 a.m. to 5:30 p.m., Monday through Friday. The plant will be 80 feet wide off the dock during operations and lit after hours. Mariners should contact the M/V ROBERT CALVEY on VHF-FM Channels 13 or 16, during working hours, or at (608) 519-5273, after hours, for any questions or project updates. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution.
Position 40-33.35N 089-40.27W
USCG Heartland (MRS) District Local Notice to Mariners 47/2026