LOWER MISSISSIPPI RIVER - UPPER MISSISSIPPI RIVER
General / Marine Construction (Excluding Bridges) / Dredging
Commencing November 16, 2026 and continuing until further notice, mechanical dredging will be conducted in the vicinity of Mile 289.5. Dredging will be performed 7-days a week, from 7:00 a.m. to 5:30 p.m. Vessels are requested to contact the M/V CLINTON or M/V DAVENPORT 30-minutes in advance on VHF-FM Channel 13, 14, 16 or 82. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.
USCG Heartland (MRS) District Local Notice to Mariners 47/2026