LOWER MISSISSIPPI RIVER - UPPER MISSISSIPPI RIVER
General / Bridges / Construction
Chester Bridge; Due to on-going bridge demolition of the existing bridge, the horizontal channel is reduced by 80 feet from the right descending pier. Mariners are advised to contact the M/V ANDREA or RUBY BELLE via VHF-FM channels 13, 14 and 16 for further information.
Position 37-54.17N 089-50.20W
USCG Heartland (MRS) District Local Notice to Mariners 45/2026