LOWER MISSISSIPPI RIVER - ILLINOIS RIVER
General / Marine Construction (Excluding Bridges) / Dredging
Continuing until further notice, M/V HOUSTON T., is conducting dredging operations between approximate Miles 146.0 and 145.2. Work will be conducted 12-hours a day, 7-days a week. M/V HOUSTON T. will monitor VHF-FM Channel 13, and requests 45-minutes advance notice of passage. Mariners are urged to transit the area at their slowest safe speed to minimize their wake and proceed with caution after passing arrangements have been made.
USCG Heartland (MRS) District Local Notice to Mariners 40/2026