NEW ORLEANS TO BATON ROUGE - LOWER MISSISSIPPI RIVER
General / Marine Construction (Excluding Bridges) / Dredging
Commencing July 1, 2026, and continuing until April 1, 2027, the Dredge M. GARRISON will be conducting dredging operations at Fullen Dock, along the LDB, in the vicinity of Mile 740.0. Work will be conducted 6:00 a.m. until 6:00 p.m., 7-days a week. The Dredge M. GARRISON will monitor VHF-FM Channel 7. Mariners are urged transit the area at their slowest safe speed to minimize their wake and proceed with caution.
USCG Heartland (MRS) District Local Notice to Mariners 45/2026