LOWER MISSISSIPPI RIVER - MISSOURI RIVER
General / Bridges / Repairs, Painting, Or Fender Replacement
Discovery Bridge; Continuing through December 31, 2027, the vertical clearance will be reduced by 3 feet by the installed safespan. Mariners are urged to transit the area with caution.
Position 38-47.90N 090-28.02W
USCG Heartland (MRS) District Local Notice to Mariners 45/2026