HomeMapSky mapAlpha
More
Account
Loading…
Language: English
I am the creator and developer of SeaLagom.

粤航警761/26

Archived
Received: 21 Oct 2026, 06:27Archived: 23 Oct 2026, 03:17Updated: 31 Oct 2026, 12:31
Subscribe
Show on map
Search

analysis

No longer in force

Tug towing drilling platform in Pearl River Estuary on 22 Oct

On 22 Oct from 0200 to 1500 UTC a tug named 正力18000 will tow drilling platform 海洋石油981 through the Pearl River Estuary. Passage is from 22-01.4N 113-58.9E to 22-30.1N 113-50.9E at about 5 knots with a towing hawser length of 294 meters. Required lights and shapes will be displayed where visible. Mariners are asked to give a wide berth.

Give a wide berth to the tow, maintain a lookout and navigate with caution.

Type
Towing operations · severity moderate
Feed
Offshore works, rigs and towingAll warnings of this kind on the map (contributors), or as an API feed: /api/v2/feeds/offshore/
Location
Pearl River Estuary (passage between given positions)
Validity
From 22 Oct 2026, 02:00 UTC
Until 22 Oct 2026, 15:00 UTC10月22日0200时至1500时
Activity periods
  • 22 Oct 2026, 02:00 UTC - 22 Oct 2026, 15:00 UTC (Tug towing drilling platform through stated track)
Hazards
towed drilling platform, long tow

Vessels involved

  • 正力18000 · tug (tow)
  • 海洋石油981 · drilling platform (towed)

Coast stations for this area

Generated automatically from the warning text on 21 Oct 2026, 07:48 UTC. It can be wrong: the original warning below is the authoritative text.

Message content
粤航警761/26, Pearl River Estuary, 10月22日0200时至1500时, the vessel “正力18000” towing drilling platform “海洋石油981” from 22-01.40N 113-58.90E to 22-30.10N 113-50.90E. Towing length 294米, speed 5节. Will display required lights and shapes where visible. Please give wide berth.
Beta look