China Coastal - Hebei 冀航警839/26
analysis
Activeuntil 27 Nov 2026, 19:00 UTC (in 4 days)Underwater inspection at berths 9-11, Basin 2, Jingtang (Tangshan), 21-27 Nov
Underwater inspection will be conducted at berths No.9, No.10 and No.11 in Basin No.2 of Jingtang Port (Tangshan) from 21 to 27 November 2026. Work is daily from 0800 to 1900 UTC and the operation area extends 50 metres off the front edge of those berths. Vessels are requested to navigate with caution. This message does not cancel any previous warning.
- Type
- Survey operations · severity moderate
- Feed
- Survey operationsAll warnings of this kind on the map (contributors), or as an API feed: /api/v2/feeds/survey/
- Location
- Bohai Sea, Tangshan Port, Jingtang port area, Basin No.2 (berths 9, 10, 11)
- Validity
- From 21 Nov 2026, 08:00 UTC
Until 27 Nov 2026, 19:00 UTCDAILY FROM 0800 TO 1900 UTC FROM 21 TO 27 NOV 2026 - Activity periods
- 21 Nov 2026, 08:00 UTC - 27 Nov 2026, 19:00 UTC (daily 0800-1900 UTC (21-27 Nov 2026))
- Hazards
- underwater inspection, work area 50 m off berth fronts
Generated automatically from the warning text on 21 Nov 2026, 04:52 UTC. It can be wrong: the original warning below is the authoritative text.
The whole analysis comes with Lagom
This warning's analysis also has:
- Action for mariners
- Keep-clear distance
- Translations
The action for mariners, the keep-clear distance, contacts, ships named, translations and the nearby lights and rescue centres come with Lagom and every higher plan, and with the API plans. The official warning text above is always free.