HomeMapSky mapAlpha
More
Account
Loading…
Language: English
I am the creator and developer of SeaLagom.

沪航警796/26

Archived
Received: 8 Oct 2026, 23:37Archived: 10 Oct 2026, 21:30Updated: 3 Nov 2026, 04:29
Subscribe
Show on map
Search

analysis

No longer in force

Vessel with large overhanging crane transits Yangtze River estuary near Baoshan and Yangshan

Vessel Houde 198 will transit the Yangtze River estuary. It is reported passing Baoshan light buoy south channel exit on 9th at 0900 and passing Yangshan main channel Y0 light buoy entrance on 10th at 0830. The ship is 153.8 m long and 54.432 m wide; a loaded crane projects 6.216 m beyond both port and starboard and the overhang is 29.127 m above the waterline. All vessels are asked to note the transit.

All vessels keep a safe distance and maintain caution when near the vessel during the stated transits; keep good look-out and follow local traffic control.

Type
Navigational hazard · severity moderate
Feed
Wrecks, obstructions and drifting objectsAll warnings of this kind on the map (contributors), or as an API feed: /api/v2/feeds/hazards/
Location
Yangtze River estuary (Yangshan area, Baoshan to Yangshan main channel)
Validity
From 09 Oct 2026, 09:00 UTC
Until 10 Oct 2026, 08:30 UTC9日0900时过宝山灯浮南槽航道出口,10日0830时过洋山港主航道Y0灯浮进口
Activity periods
  • 09 Oct 2026, 09:00 UTC - 09 Oct 2026, 09:00 UTC (Passing Baoshan light buoy at south channel exit)
  • 10 Oct 2026, 08:30 UTC - 10 Oct 2026, 08:30 UTC (Passing Y0 light buoy at Yangshan main channel entrance)
Hazards
overhanging crane, large beam/width, restricted clearance

Vessels involved

  • 厚德198 · vessel with overhanging crane

Aids to navigation affected

  • Other宝山灯浮 · 南槽航道出口
  • OtherY0灯浮 · 洋山港主航道进口

No aids-to-navigation list in the database yet; aids are shown as the warning names them.

Generated automatically from the warning text on 09 Oct 2026, 00:47 UTC. It can be wrong: the original warning below is the authoritative text.

Message content
Shanghai Navigation Warning 796/26, Yangtze River estuary, on the 9th at 0900, vessel Houde 198 passed the Baoshan light buoy at the south channel exit. On the 10th at 0830, it passed the Y0 light buoy at the entrance of the main channel of Yangshan Port. Destination port Yangshan Xiaoyang North. The vessel has an overall length of 153.8 m, breadth of 54.432 m; the loaded crane extends 6.216 m beyond the port side and 6.216 m beyond the starboard side; the overhanging part is 29.127 m above the waterline. All vessels please take note.
Beta look