HomeMapSky mapAlpha
More
Account
Loading…
Language: English

3247/2026

Cable-laying operations in the Cantabrian area with local closures and exclusion zones

ActiveReceived 04 Aug 2026, 08:51 UTC

Warning text

Lang
Area: CANTABRICO CABLE OPERATIONS INELFE project In accordance with decree 2026-067 of the Préfecture Maritime de l'Atlantique Fishing, anchoring, and diving are temporarily prohibited within a corridor of 0.5 nautical miles on either side of the cable route Furthermore, due to ongoing operations, navigation and all maritime activities are prohibited within a radius of 500 metres around the vessels Monna Lisa and Leonardo Da Vinci Blocks 2.16 - 2.17 - 2.18 are closed from 05/08 for the passage of Leonardo Da Vinci Block 2.19 will be closed from 11/08 Block 2.20 is closed from 01/08 for the passage of Monna Lisa GPS coordinates available on the SHOM PING website or on the NAV&CO application

Analysis

Active

Cable-laying operations (INELFE project) are taking place in the Cantabrian area under Préfecture Maritime de l'Atlantique decree 2026-067. Fishing, anchoring and diving are prohibited within 0.5 nautical miles either side of the cable route. Navigation and all maritime activities are prohibited within a 500 metre radius around the vessels Monna Lisa and Leonardo Da Vinci. Several numbered blocks are closed from specified dates (01/08, 05/08 and 11/08) as noted.

Type
Cable / pipeline work · severity moderate
Feed
Cable and pipeline operationsAll warnings of this kind on the map, or as an API feed.
Location
Cantabrico (Cantabrian area)
Validity
From 01 Aug 2026, 00:00 UTC
Le bloc 2.20 est fermé depuis le 01/08; Les blocs 2.16 - 2.17 - 2.18 sont fermés à partir du 05/08; Le bloc 2.19 sera fermé à partir du 11/08. Pêche, mouillage et plongée interdites dans un corridor de 0.5 mille nautique de part et d’autre du tracé du câble. Navigation interdite dans un rayon de 500
Activity periods
  • 01 Aug 2026, 00:00 UTC - ? (Block 2.20 closed from 01/08 (start date given; no end date) 2026)
  • 05 Aug 2026, 00:00 UTC - ? (Blocks 2.16-2.17-2.18 closed from 05/08 (start date given; no end date) 2026)
  • 11 Aug 2026, 00:00 UTC - ? (Block 2.19 closed from 11/08 (start date given; no end date) 2026)
Hazards
cable-laying operations, prohibited corridor alongside cable, exclusion zone around vessels

Worked out automatically from the warning text on 09 Oct 2026, 15:18 UTC. It can be wrong: the official warning text is the authority.

The whole analysis comes with Lagom

This warning's analysis also has:

  • Action for mariners
  • Keep-clear distance
  • Contacts
  • Ships named
  • Translations

The action for mariners, the keep-clear distance, contacts, ships named, translations and the nearby lights and rescue centres come with Lagom and every higher plan, and with the API plans. The official warning text above is always free.

Beta look