HomeMapSky mapAlpha
More
Account
Loading…
Language: English

127/2026

Dredging in Bassin Carnot, Port de Calais on 29 Oct

Expiredended 29 Oct 2026, 12:00 UTC (5 days ago)Received 28 Oct 2026, 13:54 UTC

Warning text

Lang
Area: PAS DE CALAIS Locality: PORT DE CALAIS DREDGING_OPERATION On 29/10/2026 between 08h00 and 12h00 (LT) Works to lower the level of bassin Carnot. PASSAGE AT HIGH TIDE WITH ALL GATES OPEN IS MAINTAINED Marine level at the end of the works: +6.80m

Analysis

Expiredended 29 Oct 2026, 12:00 UTC (5 days ago)

Dredging works to lower the level of Bassin Carnot in Port de Calais. Activity is scheduled on 29/10/2026 between 08:00 and 12:00 (stated as LT). Passage at high tide with all gates open is maintained. Marine level at the end of the works will be +6.80 m.

Navigate with caution in the area; note that passage at high tide with all gates open is maintained.

Type
Dredging / works · severity moderate
Feed
Offshore works, rigs and towingAll warnings of this kind on the map, or as an API feed.
Location
Port de Calais, Pas de Calais
Validity
From 29 Oct 2026, 08:00 UTC
Until 29 Oct 2026, 12:00 UTCLe 29/10/2026 entre 08h00 et 12h00 (LT)
Activity periods
  • 29 Oct 2026, 08:00 UTC - 29 Oct 2026, 12:00 UTC (29/10/2026 between 08:00 and 12:00 (stated as LT))
Hazards
dredging works

Worked out automatically from the warning text on 28 Oct 2026, 14:07 UTC. It can be wrong: the official warning text is the authority.

Beta look