SOUTH ATLANTIC.
BRAZIL.
DNC 01.
1. SURVEY OPERATIONS IN PROGRESS UNTIL
31 MAR 26 BY M/V RAMFORM TETHYS,
M/V LINDE G, M/V NV AVEIRO AND
M/V THOR FREYJA TOWING 12 10050 METER
LONG CABLES IN AREA BOUND BY
00-15.11S 040-17.30W, 00-15.42S 043-43.45W,
00-32.09S 043-43.46W, 01-14.12S 043-20.22W,
01-14.11S 042-53.46W, 01-44.59S 042-40.34W,
02-03.48S 041-39.09W, 01-45.01S 041-39.09W,
02-02.24S 041-03.57W, 02-00.05S 040-54.48W,
02-02.31S 040-40.04W, 02-00.00S 040-30.00W,
01-54.07S 040-17.24W.
WIDE BERTH REQUESTED.
2. CANCEL HYDROLANT 1727/25.
3. CANCEL THIS MSG 010001Z APR 26.