SOUTH ATLANTIC.
BRAZIL.
DNC 01.
1. SURVEY OPERATIONS IN PROGRESS UNTIL 20 OCT
BY M/V BGP DRAGON TOWING NINE 300 METER
LONG CABLES IN AREAS BOUND BY:
A. 21-56.15S 039-54.84W, 21-56.22S 039-45.97W,
21-57.99S 039-45.95W, 21-57.89S 039-54.85W.
B. 21-13.55S 040-04.73W, 21-16.65S 039-52.38W,
21-24.29S 039-56.84W, 21-21.03S 040-08.09W.
WIDE BERTH REQUESTED.
2. CANCEL HYDROLANT 1587/25
3. CANCEL THIS MSG 210001Z OCT 25.