Canada - Prairies - Manitoba Lakes NW-C-1209-25
analysis
ActiveBridge repair at Windy Point, Rainy Lake - vertical clearance reduced by 2.4 m
Repair work on the Windy Point Bridge (Rainy Lake) is in progress. Bridge vertical clearance is reduced by 2.4 metres and buoys are on scene at the worksite. Position given for the works is 48° 41.280'N 093° 11.477'W. Message cancels NW-C-0047-25.
- Type
- Dredging / works · severity moderate
- Feed
- Offshore works, rigs and towingAll warnings of this kind on the map (contributors), or as an API feed: /api/v2/feeds/offshore/
- Location
- Rainy Lake, Windy Point
- Validity
- From 20 May 2025, 16:51 UTC
Date 2025-05-20 16:51 UTC - Repair work on the Windy Point Bridge in progress. Bridge clearance reduced by 2.4 metres. Buoys on scene. - Hazards
- reduced vertical clearance, worksite buoys
- Cancels
- NW-C-0047-25
Generated automatically from the warning text on 28 Sept 2026, 19:48 UTC. It can be wrong: the original warning below is the authoritative text.
The whole analysis comes with Lagom
This warning's analysis also has:
- Action for mariners
- Lights and buoys affected
- Charts
- Translations
- Nearby lights and rescue centres
The action for mariners, the keep-clear distance, contacts, ships named, translations and the nearby lights and rescue centres come with Lagom and every higher plan, and with the API plans. The official warning text above is always free.