HomeMapWorld mapAlphaLearnNew
More
Account
Loading…
Language: English

Canada - Prairies - Manitoba Lakes NW-C-1209-25

Received: Source checked:
Subscribe
Show on map
Search

analysis

Active

Bridge repair at Windy Point, Rainy Lake - vertical clearance reduced by 2.4 m

Repair work on the Windy Point Bridge (Rainy Lake) is in progress. Bridge vertical clearance is reduced by 2.4 metres and buoys are on scene at the worksite. Position given for the works is 48° 41.280'N 093° 11.477'W. Message cancels NW-C-0047-25.

Type
Dredging / works · severity moderate
Feed
Offshore works, rigs and towingAll warnings of this kind on the map (contributors), or as an API feed: /api/v2/feeds/offshore/
Location
Rainy Lake, Windy Point
Validity
From 20 May 2025, 16:51 UTC
Date 2025-05-20 16:51 UTC - Repair work on the Windy Point Bridge in progress. Bridge clearance reduced by 2.4 metres. Buoys on scene.
Hazards
reduced vertical clearance, worksite buoys
Cancels
NW-C-0047-25

Generated automatically from the warning text on 28 Sept 2026, 19:48 UTC. It can be wrong: the original warning below is the authoritative text.

The whole analysis comes with Lagom

This warning's analysis also has:

  • Action for mariners
  • Lights and buoys affected
  • Charts
  • Translations
  • Nearby lights and rescue centres

The action for mariners, the keep-clear distance, contacts, ships named, translations and the nearby lights and rescue centres come with Lagom and every higher plan, and with the API plans. The official warning text above is always free.

Message content
NW-C-1209-25 Date 2025-05-20 16:51 UTC Status Published Title Marine works - Bridge Repair Cancels NW-C-0047-25 Areas Rainy Lake Vicinity Windy Point Categories Works (Other) Description Repair work on the Windy Point Bridge in progress. Bridge clearance reduced by 2.4 metres. Buoys on scene. Position 48° 41.280'N 093° 11.477'W Charts 6108(NAD83)
Beta look