HomeMapWorld mapAlphaLearnNew
More
Account
Loading…
Language: English

Canada - Maritimes NW-M-0897-26

SÉCURITÉArchived
Received: Archived: Source checked:
Subscribe
Show on map
Search

analysis

No longer in force

Dredging and disposal operations at Blacklands Gully and Pointe a Maxime, Northumberland Strait

The suction dredge Maria Chapdelaine will conduct daily dredging at Blacklands Gully and Pointe a Maxime, within the channel and at wharf entrances. Dredged material will be discharged to ocean disposal sites via a pipeline approximately 480 m south of the channel. Operations begin 01 Jul 2026 at 0900 UTC and will occur during daylight hours. Mariners are requested to maintain a minimum wash in the area of operations.

Type
Dredging / works · severity moderate
Feed
Offshore works, rigs and towingAll warnings of this kind on the map (contributors), or as an API feed: /api/v2/feeds/offshore/
Location
Northumberland Strait, vicinity Blacklands Gully and Pointe a Maxime
Validity
From 01 Jul 2026, 09:00 UTC
beginning 010900UTC Jul 2026 during daylight hours.
Activity periods
  • 01 Jul 2026, 09:00 UTC - ? (daily during daylight hours)
Hazards
dredging operations, pipeline disposal of dredged material, disposal site within pipeline range of channel

Generated automatically from the warning text on 28 Sept 2026, 05:39 UTC. It can be wrong: the original warning below is the authoritative text.

The whole analysis comes with Lagom

This warning's analysis also has:

  • Action for mariners
  • Keep-clear distance
  • Ships named
  • Charts
  • Translations
  • Nearby lights and rescue centres

The action for mariners, the keep-clear distance, contacts, ships named, translations and the nearby lights and rescue centres come with Lagom and every higher plan, and with the API plans. The official warning text above is always free.

Keywords

  • Operationsdredging operations
Message content
NW-M-0897-26 Date 2026-06-30 16:07 UTC Status Published Title Marine Works Areas Northumberland Strait Vicinity Blacklands Gully Categories Dredging Operation Description The Suction Dredge Maria Chapdelaine will be conducting daily dredging operations at Blacklands Gully and Pointe Maxime, within the channel as well as at the entrance to the wharves, beginning 010900UTC Jul 2026 during daylight hours. The dredged material will be disposed of at the ocean disposal sites via a pipeline, approximately 480m south of channel. Mariners are requested to maintan a minimum wash in the area of operations. Position Centroid : 46° 46.012'N 064° 51.395'W (Blacklands Gully Load and Disposal Site) Pt 1: 46° 46.375'N 064° 52.287'W Pt 2: 46° 46.090'N 064° 52.465'W Pt 3: 46° 45.584'N 064° 50.646'W Pt 4: 46° 46.241'N 064° 50.694'W Pt 5: 46° 46.199'N 064° 51.897'W 46° 47.011'N 064° 53.116'W (Pointe a Maxime Load Site) 46° 47.161'N 064° 53.417'W (Pointe a Maxime Disposal Site) Charts 4906(NAD83)
Beta look