HomeMapWorld mapAlphaLearnNew
More
Account
Loading…
Language: English

Canada - Pacific Coast NW-P-1322-26

Received: Source checked:
Subscribe
Show on map
Search

analysis

Activeuntil 01 Dec 2026, 00:00 UTC (in 4 days)

Walkway installation closes east navigational channel in Canoe Passage, Fraser River

A walkway will be installed across Canoe Passage in the Fraser River at the given position. A derrick barge will be on site and anchored in the east navigational channel, which will be closed for the duration of the project. Hours of operation are daily 1330-0000 UTC from 28 Sep to 01 Dec. The barge will monitor VHF channel 18A.

Type
Dredging / works · severity moderate
Feed
Offshore works, rigs and towingAll warnings of this kind on the map (contributors), or as an API feed: /api/v2/feeds/offshore/
Location
Fraser River, Canoe Passage
Validity
From 27 Sept 2026, 13:31 UTC
Until 01 Dec 2026, 00:00 UTC2026-09-27 13:31 UTC To 2026-12-01 00:00 UTC
Activity periods
  • 28 Sept 2026, 13:30 UTC - 01 Dec 2026, 00:00 UTC (daily 1330-0000 UTC (hours of operation))
Hazards
worksite, anchored derrick barge, east navigational channel closed

Generated automatically from the warning text on 27 Sept 2026, 15:08 UTC. It can be wrong: the original warning below is the authoritative text.

The whole analysis comes with Lagom

This warning's analysis also has:

  • Action for mariners
  • Contacts
  • Ships named
  • Charts
  • Translations
  • Nearby lights and rescue centres

The action for mariners, the keep-clear distance, contacts, ships named, translations and the nearby lights and rescue centres come with Lagom and every higher plan, and with the API plans. The official warning text above is always free.

Keywords

  • Geometry refspoint
  • Geometry phrasesanchored in
Message content
NW-P-1322-26 Date 2026-09-27 13:31 UTC To 2026-12-01 00:00 UTC Status Published Title Marine Works - Walkway Installation Areas Fraser River Categories Works in Progress Description A walkway is to be installed across Canoe Passage at 49 04.818N 123 07.729W. Hours of operation from 1330 to 0000 UTC daily from 28 Sept to 01 Dec. A derrick barge will be on site monitoring VHF channel 18A. The barge will be anchored in the east navigational channel which will be closed for the duration of the project. Position 49° 04.818'N 123° 07.729'W Charts 3492(NAD83)
Beta look