NW-P-0129-25
SÉCURITÉArchivedReceived: 24 Jan 2025, 00:00Archived: 21 Oct 2026, 15:48Updated: 2 Nov 2026, 03:08
analysis
No longer in forceCable laying suspended; buoys marking cable ends in Strait of Georgia
Cable laying operations in the Strait of Georgia have been suspended. Two buoy systems have been deployed to mark the cable ends at the two positions provided. No end time or further instructions are given. Mariners should navigate with caution and avoid the marked positions.
Navigate with caution and keep well clear of the marked buoy positions that indicate cable ends.
- Type
- Cable / pipeline work · severity moderate
- Feed
- Cable and pipeline operationsAll warnings of this kind on the map (contributors), or as an API feed: /api/v2/feeds/cables/
- Location
- Strait of Georgia
- Validity
- From 24 Jan 2025, 20:40 UTC
Date 2025-01-24 20:40 UTC - Hazards
- cable laying operation, buoys marking cable ends
- Cancels
- NW-P-0112-25
Coast stations for this area
- RCCJRCC VictoriaCanada70 NM from the area
- DSCDSC Station TexadaJRCC VictoriaCanadaMMSI 003160014VHF 40range 40 NM20 NM from the area
- DSCDSC Station Bowen IslandJRCC VictoriaCanadaMMSI 003160011VHF 40range 40 NM26 NM from the area
- DSCDSC Station Watts PointJRCC VictoriaCanadaMMSI 003160010VHF 40range 40 NM31 NM from the area
- DSCDSC Station ComoxJRCC VictoriaCanadaMMSI 003160014VHF 40range 40 NM40 NM from the area
- DSCDSC Station Annacis IslandJRCC VictoriaCanadaMMSI 003160011VHF 40range 40 NM46 NM from the area
Aids to navigation affected
- Newly establishedbuoy · 49° 32.320'N 123° 59.070'W
- Newly establishedbuoy · 49° 26.560'N 123° 48.480'W
No aids-to-navigation list in the database yet; aids are shown as the warning names them.
Generated automatically from the warning text on 28 Sept 2026, 19:58 UTC. It can be wrong: the original warning below is the authoritative text.
Keywords
- Operationscable laying, cable laying operation
- Geometry refspoint
- Geometry phrasesin position