NW-P-1155-26
Date
2026-08-19 01:37 UTC To 2026-08-31 01:00 UTC
Status
Published
Title
Marine Works
Areas
Strait of Georgia
Categories
Works (Other)
Description
Sheet pile installation, Fraser River South bank downstream of Matsqui Island. Work within rectangle with corner points:
49 08.535N 122 23.671W
49 08.603N 122 23.710W
49 08.618N 122 23.648W
49 08.551N 122 23.610W
Hours of operation; Monday to Friday 1400 UTC to 0100 UTC, 19 Aug. to 30 Aug. 2026.
Vessels monitoring VHF channels 16, 69, and 74.
Mariner are avised to avoid the work zone.
Caution.
Position
Centroid : 49° 08.577'N 122° 23.660'W
Pt 1: 49° 08.535'N 122° 23.671'W
Pt 2: 49° 08.603'N 122° 23.710'W
Pt 3: 49° 08.618'N 122° 23.648'W
Pt 4: 49° 08.551'N 122° 23.610'W
Charts
3488(NAD83)