Bulgaria 623/26
Archivedanalysis
No longer in forceUnderwater hydro-engineering (mussel farm) works in Sozopol Bay until 30 Oct 2026
From 14 Sep until 30 Oct 2026 there will be underwater hydro-engineering works for construction of a mussel farm (Sea Soul) in Sozopol Bay. The listed area is prohibited for navigation, anchoring, drifting, setting of nets and fishing. All ships are instructed to navigate with reduced speed and increased caution.
- Type
- Offshore operations · severity moderate
- Feed
- Offshore works, rigs and towingAll warnings of this kind on the map (contributors), or as an API feed: /api/v2/feeds/offshore/
- Location
- Sozopol Bay
- Validity
- From 14 Sept 2026, 00:00 UTC
Until 30 Oct 2026, 23:59 UTCFM 14.09. TILL 30.10.2026 - Activity periods
- 14 Sept 2026, 00:00 UTC - 30 Oct 2026, 23:59 UTC (continuous activity period as stated)
- Hazards
- underwater hydro-engineering works, prohibited area for navigation/anchoring, fishing prohibited
Generated automatically from the warning text on 27 Sept 2026, 21:37 UTC. It can be wrong: the original warning below is the authoritative text.
The whole analysis comes with Lagom
This warning's analysis also has:
- Action for mariners
- Keep-clear distance
- Translations
- Nearby lights and rescue centres
The action for mariners, the keep-clear distance, contacts, ships named, translations and the nearby lights and rescue centres come with Lagom and every higher plan, and with the API plans. The official warning text above is always free.