HomeMapWorld mapAlphaQuizNew
More
Account
Loading…
Language: English

15/26 Porto Santo

SÉCURITÉ
Received: 20 Nov 2026, 10:03Active until: 27 Nov 2026, 16:00Updated: 20 Nov 2026, 18:58
Subscribe
Show on map
Search

analysis

Scheduledstarts 22 Nov 2026, 00:00 UTC (in 27 h)

Dredging and sand nourishment off Praia da Fontinha, Porto Santo from 22 Nov (5 days)

From 22 November, dredging and artificial sand supply operations will take place off Praia da Fontinha for a foreseen period of five days. Navigation off Fontinha Beach and adjacent areas is restricted so as not to interfere with the works. All vessels must keep a safe distance and maintain reduced speed to avoid accidents. Positions defining the work area are provided in the message.

Type
Dredging / works · severity moderate
Feed
Offshore works, rigs and towingAll warnings of this kind on the map (contributors), or as an API feed: /api/v2/feeds/offshore/
Location
off Praia da Fontinha, Porto Santo
Validity
From 22 Nov 2026, 00:00 UTC
Until 26 Nov 2026, 23:59 UTCFROM NOVEMBER 22, ... FOR A FORESEEN PERIOD OF FIVE DAYS.
Activity periods
  • 22 Nov 2026, 00:00 UTC - 26 Nov 2026, 23:59 UTC (dredging and artificial sand supply, foreseen period five days from 22 November)
Hazards
dredging operations, artificial sand nourishment, restricted navigation

Generated automatically from the warning text on 20 Nov 2026, 12:17 UTC. It can be wrong: the original warning below is the authoritative text.

The whole analysis comes with Lagom

This warning's analysis also has:

  • Action for mariners
  • Translations
  • Nearby lights and rescue centres

The action for mariners, the keep-clear distance, contacts, ships named, translations and the nearby lights and rescue centres come with Lagom and every higher plan, and with the API plans. The official warning text above is always free.

Keywords

  • Operationsdredging operations
Message content
AVISA-SE TODA A NAVEGAÇÃO QUE, A PARTIR DO DIA 22 DE NOVEMBRO, IRÃO DECORRER OPERAÇÕES DE DRAGAGEM FRENTE À PRAIA DA FONTINHA COM ALIMENTAÇÃO ARTIFICIAL DE AREIA PARA A PRAIA POR UM PERÍODO PREVISTO DE CINCO DIAS. FICA DESTA FORMA, CONDICIONADA TODA A NAVEGAÇÃO FRENTE À PRAIA DA FONTINHA E ÁREAS ADJACENTES, DE MODO A NÃO INTERFERIR COM OS TRABALHOS EM CURSO. ⚠️ TODAS AS EMBARCAÇÕES QUE NAVEGUEM NA ÁREA DEVEM DAR UM RESGUARDO DE SEGURANÇA E MANTER UMA VELOCIDADE REDUZIDA A FIM DE SE EVITAREM ACIDENTES. ALL NAVIGATION IS ADVISED THAT, FROM NOVEMBER 22, DREDGING OPERATIONS WILL TAKE PLACE OFF THE BEACH OF FONTINHA WITH ARTIFICIAL SAND SUPPLY TO THE BEACH FOR A FORESEEN PERIOD OF FIVE DAYS. IN THIS WAY, ALL NAVIGATION OFF FONTINHA BEACH AND ADJACENT AREAS IS CONDITIONED SO AS NOT TO INTERFERE WITH THE ONGOING WORKS. ⚠️ ALL VESSELS NAVIGATING IN THE AREA MUST KEEP A SAFE DISTANCE AND MAINTAIN A REDUCED SPEED TO AVOID ACCIDENTS. POSITION: 33-03.31N 016-20.11W POSITION: 33-03.23N 016-20.24W POSITION: 33-03.20N 016-20.20W POSITION: 33-03.28N 016-20.07W POSITION: 33-03.35N 016-20.24W POSITION: 33-03.37N 016-20.21W POSITION: 33-03.30N 016-20.13W POSITION: 33-03.27N 016-20.17W
Beta look