HomeMapWorld mapAlphaLearnNew
More
Account
Loading…
Language: English

Finland 146/2026

Received: Source checked:
Subscribe
Show on map
Search

analysis

Active

Bridge construction in Kuusistonsalmi on Airisto-Harvaluoto-Lemlahti boat route

Bridge construction is ongoing in Kuusistonsalmi on the Airisto-Harvaluoto-Lemlahti boat route (position 60-23.45N 022-20.98E). A 10 metre wide passage has been established through temporary constructions for yachts. Vertical clearance is 16.5 m from 15 Apr to 31 Oct and 2 m from 1 Nov to 15 Apr. The boat route may be closed for short periods during the boating season and completely closed in winter; yachtsmen are advised to navigate with caution.

Type
Offshore operations · severity moderate
Feed
Offshore works, rigs and towingAll warnings of this kind on the map (contributors), or as an API feed: /api/v2/feeds/offshore/
Location
Kuusistonsalmi, Airisto-Harvaluoto-Lemlahti boat route
Activity periods
  • 15 Apr 2026, 00:00 UTC - 31 Oct 2026, 23:59 UTC (seasonal vertical clearance 16.5 m (15 Apr-31 Oct))
  • 01 Nov 2026, 00:00 UTC - 15 Apr 2027, 23:59 UTC (seasonal vertical clearance 2 m (1 Nov-15 Apr))
Hazards
bridge construction, restricted passage, reduced vertical clearance, temporary closures possible

Generated automatically from the warning text on 20 Nov 2026, 01:07 UTC. It can be wrong: the original warning below is the authoritative text.

The whole analysis comes with Lagom

This warning's analysis also has:

  • Action for mariners
  • Keep-clear distance
  • Translations
  • Nearby lights and rescue centres

The action for mariners, the keep-clear distance, contacts, ships named, translations and the nearby lights and rescue centres come with Lagom and every higher plan, and with the API plans. The official warning text above is always free.

Message content
WARNINGS FOR YACHTMEN AIRISTO-HARVALUOTO-LEMLAHTI BOAT ROUTE BRIDGE CONSTRUCTION WORK ONGOING IN KUUSISTONSALMI. A 10 M WIDE PASSAGE ESTABLISHED FOR YACHTSMEN IN THE TEMPORARY CONSTRUCTIONS. CLEARANCE HEIGHT CLEARANCE HEIGHT 15.4.-31.10. 16,5 M AND 1.11.-15.4. 2 M. THE BOAT ROUTE MAY BE CLOSED FOR SHORT PERIODS DURING THE BOATING SEASON AND WILL BE COMPLETELY CLOSED TO NAVIGATION DURING THE WINTER SEASON. YACHTSMEN ARE ADVICED TO NAVIGATE WITH CAUTION. POSITION: 60-23.45N 022-20.98E
Beta look